It is recommended that both sides of the ridge of a steel building be sheeted simultaneously. This will keep the insulation covered for the maximum amount of time and the panel ribs can be kept in proper alignment for the ridge panel. Check for proper coverage as the sheeting progresses. Note panel sheeting sequence below!
NOTE:
If oil or other slippery substances are present on the roof panels, wipe them clean immediately to prevent slipping or falling. Workers should maintain a constant awareness of their location relative to the roof edge. Use OSHA approved tie offs, nettings, or rails when working on roof surfaces.