5.16 SEALING THE ENDLAPS OF THE STEEL BUILDING

General steel panel endlaps place a run of tape sealant across the full panel width 1/2” below the fastener line. The panel endlaps have a 6” minimum overlap located over a purlin as shown. Locate the fasteners 1 above the purlin web according to the fastener layout.

 

 

 

NOTE:

Do not step on panel endlaps until fully secured with fasteners.

 

Panel Endlaps >>

 


 

Steel Building Erection Manual